Project Cost: $2,400,000
Owner: City of Eureka
Craig Sabo
P.O. Box 125
Eureka, MO. 63025
(636) 938-5233
Engineer: George Butler and Associates
Jim Dunajcik
225 South Main Street, Suite 200
O’Fallon, MO. 63366-2892
(636) 240-2444
Project Scope: The project consisted of the construction of 5 brine tanks, addition of water softening equipment and associated piping/electrical controls to existing facilities at various locations in Eureka, MO. The project also included construction of a new well house at one of the locations.
- Project Cost: $2,400,000